Project 360 - In-House Plumbing

Posted in Project 360 - Flow, Project 360 by Jacob on the January 4th, 2009

To recap the plumbing on Project 360 there are essentially 2 systems:

1) The in-house plumbing. This consists of the piping between the display tank and sump as well as the piping, electrical conduit, and ducting through the walls and into the crawlspace. This is part of Phase I (see below) and is now complete.

2) The water room plumbing. This consists of the piping between the water storage tanks, dosing system, auto top off system, and the display tank. This is part of Phase II and is partially complete.

In case I have not mentioned it already I have split the project into 2 phases as well. Phase I - get the tank up and running under manual control, and Phase II - integrate the automation components. Below are some photos along with descriptions of the Phase I plumbing.

2009-01_1490  800x533

(more…)